University Park, Maryland
Industrial epoxy flooring from University Park crews for the shops and light industrial bays along Baltimore Avenue, specced around the chemicals, heat, and loads inside your building.

Industrial floors fail when a generic coating meets real exposure. Oils, solvents, thermal shock from wash downs, and vibration from heavy equipment each attack a coating differently, and a system chosen from a catalog page rarely matches the bay it lands in.
Our industrial work starts with a walk of the facility. We note what is stored, what is spilled, what rolls across the floor, and where the drains sit. The resin build then follows that exposure bay by bay, with reinforced systems in the heavy zones and chemical resistant topcoats where the work demands them.
No two bays in a working building see the same abuse, so the build is not uniform either.
Shops along the corridor cannot hand over the whole floor at once. We phase industrial work by bay or by shift, cure each section fully before equipment returns, and keep the schedule in writing so production planning can rely on it.
The payoff shows up in housekeeping. Spills wipe off a sealed surface instead of soaking into concrete, dust stops migrating onto stored goods, and the slab itself is protected from the chemicals that would otherwise eat into it.


A light industrial bay on Baltimore Avenue had oil darkened concrete and a coating from years back peeling in the main work lane. We degreased and ground the slab, rebuilt two damaged joints, and installed a reinforced high build system with a chemical resistant topcoat and a striped pedestrian walkway. The bay returned to service in sections, and spills now wipe up at the end of the day instead of soaking in.
Describe your facility and the work that happens on the floor, and we will walk the space and spec the build bay by bay.
Prefer to talk it through first? Send the form and we will call you back at the number you give us.